Kiel Utility and Street Reconstruction
Project Location: Paine Street and St. Paul Street, City of Kiel, WI
REL worked with the City of Kiel to design and construct upgraded utilities to accommodate increased sewer flows and water demands and to replace existing lead water services. Deteriorated paved surfaces including curb and gutter, pavement, and sidewalks were reconstructed and/or realigned to provide for safer roadways, sidewalks and intersections. Additionally, wider sidewalks near a bus loading and unloading turnout in the school area were designed to provide for improved student safety.
The area on Paine St. is immediately adjacent to the City's Village Hall, Police Department, a City Park, and Middle School. Construction was coordinated to avoid conflicts with school schedules and maintain access to the other Village facilities at all times. Specifically, work was not allowed to begin until school was completed in June, and all work was completed prior to the start of school in late August; a summer festival in the City Park was also accommodated during the course of construction.
REL acquired permits from Wisconsin Department of Transportation, and Wisconsin Department of Natural Resources, as required to accomplish the work.
Client
City of KielCategory
- Municipal Engineering
Services Used
- Civil Engineering
- Construction Services
- Municipal Engineering
- Permitting
- Surveying Services
- Transportation
- Wastewater
- Water Systems
Related Items
-
Hilbert Sanitary Sewer Interceptor Replacement
Municipal Engineering -
Darlington Industrial Park Lift Station Upgrade
Municipal Engineering -
Wrightstown Water Transmission and Meter Stations
Municipal EngineeringWater Systems