Hilbert Sludge Dewatering Upgrades

2025-05-21T19:57:26+00:00

Project Highlights

The project involved the removal of the existing belt press system and the installation of a new screw press system, aimed at improving efficiency in waste management. Additionally, it included the repair of the septage receiving tank’s coating system, addressing coating failures to ensure proper functionality and longevity of the tank.

Project Details

The project entailed the replacement of worn-out equipment with new, upgraded models to enhance performance and reliability. The upgrade aimed to minimize downtime, improve efficiency, and ensure compliance with current operational standards. By replacing outdated components, the project optimized functionality and extended the lifespan of the overall system.

The project required careful coordination of the press replacement with the ongoing sludge hauling operations to minimize disruptions and ensure a seamless transition. This involves scheduling removal and installation activities in tandem with hauling operations, ensuring that sludge removal continues without interruption while the new press is installed.

The extent of coating failures in the septage receiving tank presented challenges, including the potential for increased corrosion, structural integrity, and contamination of the tank’s contents.

Project Location

Hilbert, WI

Client

Village of Hilbert

Category
Specialized Services

Coating Inspection

Services Provided

Greenleaf MDV Chemical Addition Project

2025-05-21T19:59:54+00:00

Project Highlights

The Wrightstown Sanitary District No. 1 needed to implement a chemical feed system for phosphorus removal in order to comply with the new, stricter effluent limits mandated by the State of Wisconsin, all while adhering to the operational deadline established by the Village’s Water Pollution Discharge Elimination System (WPDES) permit.

  • New chemical feet building
  • Two 2,500-gallon chemical storage tanks
  • Chemical transfer pump
  • Duplex chemical feed skid

Project Details

REL effectively coordinated with the Wisconsin Department of Natural Resources (DNR) throughout the planning, design, and installation phases of the chemical feed system aimed at phosphorus removal, ensuring compliance with the WPDES operational permit deadline.

Stakeholder Coordination

During the Facility Plan stage of the project, a public hearing was organized to engage the community and provide a comprehensive overview of the proposed improvements, particularly the installation of a chemical feed system for phosphorus removal. The meeting aimed to outline the necessity of the project in response to stricter state effluent limits, highlighting the environmental and regulatory implications of phosphorus discharge on local water bodies. This stakeholder engagement ensured that the public was informed and invested in the project’s objectives, ultimately aiding in its support and successful implementation.

Project Location

Greenleaf, WI

Client

Village of Greenleaf

Category
Services Provided

Whitelaw Chemical Addition Project

2025-05-21T17:03:16+00:00

Project Highlights

The Village of Whitelaw required a chemical feed system for phosphorus removal to meet stricter effluent limits from the State of Wisconsin before the operational deadline set by the Village’s WPDES permit.

  • New chemical feet building
  • Two 2,500-gallon chemical storage tanks
  • Chemical transfer pump
  • Duplex chemical feed skid

Project Details

REL effectively coordinated with the Wisconsin Department of Natural Resources (DNR) throughout the planning, design, and installation phases of the chemical feed system aimed at phosphorus removal, ensuring compliance with the Water Pollution Discharge Elimination System (WPDES) operational permit deadline.

Stakeholder Coordination

During the Facility Plan stage of the project, a public hearing was organized to engage the community and provide a comprehensive overview of the proposed improvements, particularly the installation of a chemical feed system for phosphorus removal. The meeting aimed to outline the necessity of the project in response to stricter state effluent limits, highlighting the environmental and regulatory implications of phosphorus discharge on local water bodies. This stakeholder engagement ensured that the public was informed and invested in the project’s objectives, ultimately aiding in its support and successful implementation.

Project Location

Whitelaw, WI

Client

Village of Whitelaw

Category
Services Provided

Sister Bay WWTP Modifications

2025-05-21T19:59:27+00:00

Project Highlights

The Village of Sister Bay retained Robert E. Lee & Associates to prepare a facility plan, drawings, and specifications for significant modifications to the WWTP.

Project Details

  • A significant addition to the garage was completed
  • Additional offices and a conference room were added to the Service Building
  • RAS/WAS pump replacement
  • NPW system upgrades
  • Replacement of the orbal drives and motors
  • Thickened sludge pump replacement
  • Final clarifier rebuilds
  • Added a dual pod fine bubble aeration to a sludge storage tank
  • Sludge thickening equipment replacement and upgrades
  • Upgrade disinfection system from chlorination/dechlorination to UV
  • Additional parking stalls added to the WWTP
  • Complete site asphalt replacement
  • Conversion of the a phone-based SCADA system to a radio-based SCADA system.
Project Location

Sister Bay, WI

Client

Village of Sister Bay

Category
Services Provided

Hobart Centennial Centre Elevated Storage Tank

2025-05-21T20:01:13+00:00

Project Highlights

In response to the growing demand from the rapidly developing Centennial Centre development, the Village of Hobart identified the need to increase its water supply capacity. This involved conducting thorough assessments of current water resources and infrastructure, exploring options for expansion or enhancement of existing supply systems, and potentially incorporating new water source developments to ensure that the increasing needs of the community are met efficiently and sustainably. The initiative aimed to support both current residents and future growth, facilitating the development’s success while maintaining reliable water service for the users.

Project Details

A 500,000-gallon composite elevated storage tank was successfully constructed to enhance water supply for the Village of Hobart, accompanied by upgrades to the SCADA (Supervisory Control and Data Acquisition) system that ensured operational continuity during power outages.

REL undertook the critical task of securing approvals from the Federal Aviation Administration (FAA), the Wisconsin Department of Natural Resources (WDNR), and the Wisconsin Public Service Commission, which involved meticulous adherence to regulations and safety standards. This project not only improved water storage capacity but also bolstered the resilience of the water supply system, effectively supporting the needs of the Centennial Centre development and the broader community.

Project Location

Hobart, WI

Client

Village of Hobart

Category
Services Provided
Coordinating Agencies

Hobart Public Works & Utilities Department
Federal Aviation Association
Green Bay Water Utility
WDNR
WI Public Service Commission

New Holstein Elevated Storage Tank Repainting

2025-05-21T20:02:12+00:00

Project Details

The City of New Holstein’s Elevated Storage Tanks required recoating to ensure they remained in peak operational condition. REL was tasked with providing engineering oversight for the project. REL assisted the City with the following:

  • Provided plans and specifications to identify the ideal coating system and obtained DNR approval prior to project bidding
  • Accepted bids and provided recommendations
  • Provided construction administration assistance
  • Worked with City to provide assistance with construction observation
Project Location

New Holstein, WI

Client

City of New Holstein

Category
Coordinating Agencies

New Holstein Water Utility Department
WI Department of Natural Resources

Hilbert Elevated Storage Tank Repainting

2025-05-21T20:03:09+00:00

Project Highlights

The Village of HIlbert’s Elevated Storage Tanks required recoating to ensure they remained in peak operational condition. After the EST had sustained significant damage from multiple lightning strikes, REL was tasked with providing design, permitting, telecommunication coordination, bidding, and construction services for the project.

  • Provided plans and specifications with the ideal coating system
  • Obtained DNR approved prior to project bidding
  • Accepted bids and provided recommendations
  • Provided construction administration and observation
Project Location

Hilbert, WI

Client

Village of Hilbert

Category
Coordinating Agencies

Hilbert Water Utility Department
WI Department of Natural Resources

Go to Top