Project Details
The Village of Bellevue, located in Brown County, retained Robert E. Lee & Associates (REL) to prepare plans and specifications for the replacement of the bridge on Bower Creek Road over Bower Creek. The existing bridge was in poor condition and needed to be replaced. REL preformed the hydrology and hydraulics on the waterway to determine the type and size of the new structure. The new bridge will be a 40-foot long, single-span concrete bridge with sidewalks and aesthetic treatments. REL completed the survey, approach design, environmental document, and right-of-way plat for the project. The project was designed in accordance with the WisDOT FDM guidelines.



