The City of De Pere retained Robert E. Lee & Associates to prepare plans and specifications for the well station improvements at two sites: Enterprise Drive and Merrill Street. For the Enterprise Drive well station, the column pipe was removed because the last 10-year inspection televising video showed degradation of the steel column pipe. When the well station was out of service, the pump and motor were inspected. The inspection findings proved a new pump and motor were required. Since the well station is used as a backup source of water, piping modifications were conducted to install discharge valves allowing well pump exercising without pumping into the system.
For the Merrill Street well station, a pressure relief valve being shared between the two booster pumps was removed. The piping was modified to install an air release valve for each booster pump.
Project Location

City of De Pere, WI

Client

City of De Pere

Category
Services Used

Civil Engineering, Construction Services, Municipal Engineering, Water Systems