Project Details
The project consisted of relocating about one mile of CTH Q. It removed CTH Q from STH 29 making it a safer route to travel by eliminating two intersections with STH 29. Half of the two-lane rural roadway was constructed on a new alignment and the other half utilized existing town roads.
Robert E. Lee & Associates provided survey, mapping, design, permits, public relations, and right-of-way plat on the project. A storm water settling basin was installed to treat the storm water runoff.





