Falling Waters Winery LLC Phase I ESA

2025-05-21T19:50:34+00:00

Project Details

Stephenson National Bank retained the services of Robert E. Lee & Associates to conduct a Phase I Environmental Site Assessment (ESA) for a property within Dyer Business Park in the Village of Crivitz. The purpose of the Phase I ESA is to provide information regarding recognized environmental conditions (RECs) that could affect soil and groundwater quality at the property so a level of liability can be estimated. The Phase I ESA was conducted in general conformance with the requirements of American Society for Testing and Materials Designation: E 1527-05 Phase I Environmental Site Assessment Process. The Phase I ESA included reviewing standard federal, state, and tribal environmental records; standard historical records; and conducting interviews to investigate past and current land use at the Property and/or adjacent properties. Robert E. Lee & Associates personnel also inspected the Property to identify and record RECs. The assessment revealed no direct evidence of recognized environmental conditions in connection with the Property.

Project Location

Village of Crivitz, WI

Client

Stephenson National Bank & Trust

Category
Services Used

Ruins Adventure Mini Golf Phase I ESA

2025-05-21T18:39:01+00:00

Project Details

Stephenson National Bank retained the services of Robert E. Lee & Associates to conduct a Phase I Environmental Site Assessment (ESA) for a property in the City of Oconto. The purpose of the Phase I ESA is to provide information regarding recognized environmental conditions (RECs) that could affect soil and groundwater quality at the property so a level of liability can be estimated. The Phase I ESA was conducted in general conformance with the requirements of American Society for Testing and Materials Designation: E 1527-05 Phase I Environmental Site Assessment Process. The Phase I ESA included reviewing standard federal, state, and tribal environmental records; standard historical records; and conducting interviews to investigate past and current land use at the Property and/or adjacent properties. Robert E. Lee & Associates personnel also inspected the Property to identify and record RECs. The assessment revealed no direct evidence of recognized environmental conditions in connection with the Property.

Project Location

City of Oconto, WI

Client

Stephenson National Bank & Trust

Category
Services Used

Environmental Site Assessments for Anna’s Healthcare CBRF

2025-05-21T18:18:38+00:00

Project Details

Anna’s House, Inc. retained the services of Robert E. Lee & Associates to conduct a Phase I Environmental Site Assessment (ESA) for a property in the City of Sturgeon Bay. The company was interested in building a Community Based Residential Facility (CBRF) on the property. The purpose of the Phase I ESA was to provide information regarding recognized environmental conditions (RECs) that could affect soil and groundwater quality at the property so a level of liability could be estimated. The property was identified as a former orchard, which represented an REC. As a result of the REC identified, Robert E. Lee & Associates was retained to conduct a Phase II ESA. Soil samples were obtained and laboratory analytical results identified low-level concentrations of lead, arsenic, and pesticides at the property related to the historical use of the property as an orchard. The concentrations of contaminants, however, were below the limits established by the Wisconsin Department of Agriculture, Trade and Consumer Protection (DATCP). Based on the results of the Phase II ESA, Robert E. Lee & Associates recommended that the identified contamination be reported to the DATCP with a request for no further action. DATCP indicated that remediation of the soils at the site was not necessary provided the soils were properly handled during construction activities at the property and a Cap Maintenance Plan be completed at the completion of the construction project.

Project Location

City of Sturgeon Bay, WI

Client

Bayland Buildings

Category
Services Used

Menekaunee Harbor Improvements

2025-05-21T17:21:37+00:00

Project Details

Marinette’s Menekaunee Harbor Improvement project involved dredging and removal of contaminated sediments and restoration activities within the harbor and along its shorelines. Removed material consisted of sediments that exceeded established contaminant concentration limits (environmental dredge spoils) and sediments that did not exceed established contaminant concentration limits (navigational dredge spoils). The improvement project dredged the harbor to a navigable depth of 8 feet during historic low lake levels and the non-navigational areas on the eastern side of the harbor were backfilled to provide final water depths of approximately 8 feet for habitat restoration purposes. Clean dredge spoils (termed “beneficial-use fill”) removed from the west side of the harbor were used to bring the east side to the desired restoration depths. A total of 27,130 cubic yards of environmental spoils, 30,680 cubic yards of Navigational Dredging, and 7,700 cubic yards of beneficial re-use fill material was moved within the harbor. All other large trash and debris items were transported to the landfill. Both mechanical and hydraulic dredging was utilized on this project. Hydraulic dredging was used to complete part of the beneficial-use portion, and mechanical dredging was used for all material disposed of off-site. Mechanical dredging sediment was dewatered by placing, working, and blending the material on a dewatering pad constructed in the staging area. All wastewater was collected and partially treated by an on-site facility and disposed into the sanitary sewer lines to be delivered to the City of Marinette WWTP for final treatment. Due to the creation of dredge spoils, a containment site was created on the west side of Marinette. This containment site has the capacity to hold up to 54,500 cubic yards of dredge spoils; however, only a volume of 19,200 cubic yards of material was transported to this site from the harbor. In addition, the project included shoreline improvements consisting of 8,400 square yards of riprap installation, and 160 feet of anchored sheet pile wall. The City of Marinette, in cooperation with the Wisconsin Department of Natural Resources (WDNR), is undertaking a restoration of the Menekaunee Harbor as part of the Great Lakes Restoration Initiative (GLRI). The WDNR provided the City with a $1.1 million dollar environmental repair grant that was matched at 35% ($611,474) by the City. In addition to these funding sources, the WDNR secured a $6.5 million dollar grant from the U.S. EPA’s Great Lakes National Program Office (GLNPO) through the Great Lakes Restoration Initiative (GLRI).

Project Location

City of Marinette, Marinette County, WI

Client

City of Marinette

Category
Services Used