Shawano CTH Q Reconstruction

2025-05-21T19:44:47+00:00

Project Details

The project consisted of relocating about one mile of CTH Q. It removed CTH Q from STH 29 making it a safer route to travel by eliminating two intersections with STH 29. Half of the two-lane rural roadway was constructed on a new alignment and the other half utilized existing town roads.

Robert E. Lee & Associates provided survey, mapping, design, permits, public relations, and right-of-way plat on the project. A storm water settling basin was installed to treat the storm water runoff.

Project Location

Shawano County, WI

Client

Shawano County Highway Department

Category
Services Used

Fishel Road Reconditioning

2025-05-21T19:34:37+00:00

Project Details

The Town of Alvin, located in Forest County, retained Robert E. Lee & Associates to prepare plans and specifications for the reconditioning of Fishel Road. The project started at STH 70 and ended at CTH A, a length of about 3 miles. The rustic road winds through mostly U.S. Forest Service Lands. The roadway was pulverized and resurfaced with some areas of reconstruction to improve it to current design standards. Since U.S. Forest Service funds were utilized, the project was designed in accordance within the WisDOT FDM. Robert E. Lee & Associates also performed a wetland delineation on the project.

Project Location

STH 70 to CTH A, Forest County

Client

Town of Alvin, WI

Category
Services Used

French Street (Business 41) Reconstruction

2025-05-21T19:30:18+00:00

Project Details

The City of Peshtigo retained Robert E. Lee & Associates to prepare plans and specifications for the reconstruction of French Street from Ellis Street to the Peshtigo River, Oconto Street from Ellis Street to French Street, and the storm sewer of Ellis Street from French Street to Thompson Street. The City utilized Federal Enhancement Funds, TIF District Funds, and Jurisdictional Transfer Funds for the projects. The projects included the replacement of the sanitary sewer, water main, storm sewer, curb and gutter, new HMA pavement, decorative sidewalk, and new traffic signals. The aesthetic features included decorative street lighting, planters, and trees. The project was constructed in the summer and fall of 2012.

Project Location

City of Peshtigo, WI

Client

City of Peshtigo, WI

Category
Services Used

Sheboygan Urban Street Reconstruction

2025-05-21T19:28:53+00:00

Project Details

The City of Sheboygan retained Robert E. Lee & Associates to provide the plans and specifications to reconstruct five urban projects. The projects included 1,800 feet of Huron Avenue, 900 feet of Wisconsin Avenue, 450 feet of New York Avenue, 500 feet of Center Avenue, 300 feet of 6th Street, 450 feet of Washington Court, 3,400 feet of S. 18th Street, and 450 feet of N. 5th Street. All of the streets were reconstructed with new concrete pavement, new curb and gutter, and partial replacement of the sidewalks. Some of the streets included new sanitary sewer, water main, and storm sewer. The project was constructed in 2011.

Project Location

Huron Avenue, South 18th Street, and Downtown Streets, Sheboygan, WI

Client

City of Sheboygan

Category
Services Used

Jordan Road Reconditioning

2025-05-21T18:51:42+00:00

Project Details

The project consisted of one mile of milling and resurfacing on Jordan Road, which was in a deteriorated condition with longitudinal cracking and a number of areas of alligatored cracking. There were many areas of broken curb and gutter that needed to be replaced. In addition, there were several manholes and inlets that were in poor condition and needed to be reconstructed.

Robert E. Lee & Associates provided survey, mapping, design, and construction administration on the project. ARRA funding was used on the project so it was designed in accordance with the WisDOT process.

Project Location

O’Keefe Road to Merill St., De Pere, WI

Client

City of De Pere, WI

Category
Services Used

Wisconsin Avenue Reconstruction

2025-05-21T18:41:49+00:00

Project Details

The project consisted of the reconstruction of a 0.14-mile length of Wisconsin Avenue in the downtown historical district of Neenah. The existing asphalt surface, base course, curb and gutter, and some sidewalk were removed and reconstructed with new base course, concrete pavement, curb and gutter, and sidewalk. A 12.5-foot segment of sidewalk against the business building fronts was left in place along with the existing street lights, planters, benches, and other street scaping items. Prior to the roadway reconstruction, the City of Neenah replaced water main and laterals within the project limits. During the Project Informational Meeting, business owners were asked their preference for the overall approach to construction. The business owners overwhelmingly requested the City allow a minimum of one-way traffic at all times during construction, versus closing the street thereby shortening the project duration. At that point, staging plans were developed to accommodate one-way traffic and parking along one side of the roadway at all times during construction. ARRA Funding was used on the project; therefore, it was designed in accordance with the WisDOT process.

Project Location

Main St. to Commercial St., City of Neenah, WI

Client

City of Neenah, WI

Category
Services Used

CTH PP Reconstruction

2025-05-21T18:23:53+00:00

Project Details

The project consisted of redesigning CTH PP from a two-lane rural roadway into a three-lane urban facility with curb and gutter and sidewalk. A roundabout was designed at the intersection with CTH X. The new roadway was paved with concrete pavement and included new storm sewer. The project location is from Viking Road to STH 57, a length of about 1.3 miles. Robert E. Lee & Associates provided design, permits, public relation, right-of-way plat, quantities, and specifications on the project.

Project Location

Viking Road to STH 57, Brown County, WI

Client

Brown County Highway Department

Category
Services Used

Marinette CTH BB Reconditioning

2025-05-21T18:14:41+00:00

Project Details

The project consisted of reconditioning about six miles of CTH BB from Pond Road to University Drive. The roadway was reconditioned by adding base course and pulverizing the existing pavement. The project has over 300 private driveways. There are many encroachments into the existing right-of-way such as ornamental mailboxes, retaining walls, and landscape beds that were identified so they can be removed to clear the right-of-way. Robert E. Lee & Associates provided survey, mapping, design, permits, public relations, and construction oversight on the project.